Pyritic heave
Pyritic heave is a structural defect that occurs when pyrite, a naturally occurring sulphide mineral present in hardcore fill beneath concrete floors, oxidises upon exposure to moisture and air. This oxidation process transforms pyrite into gypsum, a mineral with a much larger volume. As the gypsum expands, it exerts pressure on the overlying concrete slab, causing it to lift and crack, while also distorting and damaging internal walls, finishes, doors, and windows. The issue most commonly affects houses with ground-supported concrete floors built on pyrite-rich fill, particularly from quarries or mudstone deposits, and typically manifests years after construction.
The signs of pyritic heave become visible gradually, often a decade after building completion. Common indicators include spiderweb-like cracking patterns on concrete slabs, uneven or humped floors, and cracks in partition walls or plasterboard. Doors and windows may begin to stick or fail to close properly due to structural distortion, while secondary damage appears in finishes like tiling and plaster. Because the process is progressive and driven by chemical reactions in the foundation material, early detection is crucial to mitigate costly structural repairs and protect building integrity.
Pyritic heave was a major problem in Ireland from 2006 to 2008, with thousands of properties found to, in particular around Dublin. These were said to be caused during the period of rapid construction that occurred during what was referred to as the Celtic Tiger economic boom, named in reference to similar 'tiger' booms that had occurred in Asia. During this time the use of reactive pyrite-containing aggregate on many projects left lasting issues. Other instances of pyritic heave have also been discovered in United States (Ohio and Pennsylvania), as well as Canada.
This issues were so signifiant in Ireland that a Pyrite Resolution Board (PRB) was established and the Pyrite Resolution Act of 2013 passed by the government. Following this a Pyrite Remediation Scheme (Scheme) was established by the government to remediate dwellings that had been significantly damaged as a result of pyritic heave caused by the swelling of hardcore under ground floor slabs. Under the Act the Pyrite Resolution Board was established, to oversee implementation of the scheme and manage the application and appeals process. In 2019 it was reported "Pyrite scheme extended as number of homes remediated reaches 2,000", the scheme continues today and is still run by the Housing Agency, who were prescribed under the Act, to carry out the remediation of properties accepted into the scheme.
For further information see "Pyrite Remediation Scheme. Guide for Scheme Participants" 3rd Edition February 2019.
[edit] Related articles
Featured articles and news
The Architectural Technology podcast: Where it's AT
Catch up for free, subscribe and share with your network.
The Association of Consultant Architects recap
A reintroduction and recap of ACA President; Patrick Inglis' Autumn update.
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.



























